Maptitude P&E Tech Corner

Can I use a dummy variable for the control field if I don't care about control field values?

In order for a plan to work correctly, the control field must appear in all layers of the hierarchy, and the totals must align (block groups contain total of control field in block layer, tracts contain sum of block group values, etc).


Back to Tech Corner Support Page

Find Us 1172 Beacon St., Suite 300
Newton MA 02461 USA

Home  |  Products  |  Contact  |  Secure Store

Copyright © Caliper Corporation